Paper Factory, KKIP, Sabah, Malaysia Span Size:                          77.4 m Built Up Area:                    5,396 m2 Construction Time:          9 months

St Johns Chapel Beluran

St. Johns Chapel, Beluran BrisFrame IBS This chapel was built using BriSteel’s IBS system for the purpose of speed and cost effective construction. This project was built from start to end in a period of 3 months.

Sekolah Daif 2018

Sekolah Daif 2018 BrisFrame IBS In 2018, BriSteel Design and supplied seven schools in Sabah, Malaysia. Of these school, six of them were installed by BriSteel in the East coast of Sabah. Three schools on islands of the East coast and three schools on the east coast of Sabah.  This project is a great testament … Read more

Sekolah Daif 2017

Sekolah Daif Project 2017 BrisFrame IBS Completed in 5 months this project required BriSteel to supply IBS system for 6 schools and a further 9 schools of supply and build; a total of 15 schools completed in a period of 5 months built concurrently. BriSteel managed a total of 15* out of 30 schools released … Read more

SABATA

SABATA (Sabah Anti Tuberculosis Association ), Sabah, Malaysia This site was done in partnership with Kinsabina as a CSR project to place four staff quarters within their site as an upgrade from their existing quarters. This design has all the environmentally conscience levers pulled from reducing heat retention, increasing passive cooling and using environmentally sensible … Read more

Petronas SAMUR

SAMUR Plant (Sabah Ammonia Urea) Our Largest PEB project to date. This site boasts of over 32,900 metre square of floor space,  108 metres wide, 300 metres long and over 40 metres high. Towering over the landscape stamping Petronas as a major downstream player of Ammonia Urea in the region. Works were subcontracted to BriSteel … Read more

Petronas Basecamp Sipitang

Petronas Basecamp, Sipitang BrisFrame IBS This project was built to serve as the residence for the workers and executives for the nearby SAMUR plant. 52 units were built in BriSteel’s IBS system completed within the 4 month target meant that this project was completed in time for the Petronas employees to move in and start … Read more

Nippon Paint

Nippon Paint Span Size :                    40 m Built Up Area:                1,800 m2 Construction Time :       5 months (PEB Portion Only)

Nibong Tebal Paper Mill

Nibong Tebal Paper Mill Span :                                75 m Built Up Area :                  8,078 m2 Construction Time :       10 months

Manubar Indonesia

Manubar Indonesia BrisFrame IBS This project is BriSteel’s first export overseas. This project is located in the remote jungles of Kalimantan, deep in the Indonesian Borneo. The only form of transport available was by river, as such BrisFrame became the most obvious choice for our client due to our light and transportable system.  Dozens of … Read more